Proserv will deploy its ECG cable monitoring technology and Distributed Electrical Sensing system at Equinor's 402-MW Dudgeon offshore wind farm, with the goal of detecting cable...
Equinor has started gas production from the Troll Phase 3 stage 2 subsea expansion, bringing eight new wells online months ahead of schedule and below budget to accelerate recovery...
Equinor says its streamlined international portfolio is on track to deliver 950,000 boepd by 2030, supported by growth projects in the US Gulf, Brazil, Angola and Canada.
Equinor, Aker BP and Vår Energi will jointly mature 20-25 high-impact exploration prospects and drill about five wells annually in a bid to uncover larger discoveries needed to...
TechnipFMC, OneSubsea, Ocean Installer, NOV and Tenaris will support four Equinor-led tieback projects that could deliver up to 220 MMboe while helping reduce development costs...
Equinor’s production averaged 2,048 MMboe/d during the second quarter, the company said in a results update, up from 1,994 MMboe/d in the same quarter last year.
Equinor has awarded Ramco Norway a long-term contract covering the preparation, inspection, surface treatment and preservation of oil country tubular goods (OCTG).
The transactions could spur action on a new multi-field project close to the North Sea Troll complex and drive forward a decision on the Wisting Field in the far north.
Equinor has brought the Eirin subsea tieback onstream via Gina Krog while moving a second Norwegian North Sea tie-in forward, awarding Aker Solutions a FEED contract for the Atlantis...
Byrding C and Frida Kahlo are in the Troll and Sleipner areas respectively. Equinor plans further exploration drilling around Sleipner later this year.
Equinor has issued 12 new framework agreements to seven Norwegian engineering groups, which it hopes will help sustain projected production levels through 2035.