The Heerema Group assists in the design, construction, transport, installation and dismantling of offshore installations. The company can manage the entire offshore construction supply chain, from design to completion.

Articles

Courtesy Heerema
sleipnir
Heerema Marine Contractors’ construction vessel Sleipnir has taken delivery of a ship-based carbon capture prototype system developed by the EverLoNG consortium.
June 18, 2024
Courtesy Heerema Marine Contractors
Thialf is capable of a tandem lift of 14,200 metric tons.
Heerema Marine Contractors crane-lift barge Thialf has removed the decommissioned Schooner gas field wellhead platform from the UK southern North Sea for operator DNO.
June 5, 2023
Courtesy Heerema Marine Contractors
20221120 Hyperlapse 0117 Question This One
Heerema Marine Contractors has complete installation of 24 turbines for Parkwind’s 257-MW Arcadis Ost 1 offshore wind farm.
April 3, 2023
Courtesy C1Connections-©Kloet
103dd26102022 C1 Connections ©kloet
Heerema Marine Contractors and C1 Connections have tested a new connection system offshore for use in wind turbines and foundations.
Nov. 8, 2022
Courtesy TotalEnergies
Totalenergies
Heerema Marine Contractors’ crane-lift vessel Sleipnir has set down the final topside on a pre-installed jacket at the Tyra gas field in the Danish North Sea.
Oct. 4, 2022
Courtesy Heerema Marine Contractors
Thialf Crossing Storebaelt Bridge
Heerema Marine Contractors’ construction vessel has crossed the Storebaelt Bridge at the opening to the Baltic Sea.
Oct. 3, 2022
Courtesy Heerema Marine Contractors
Heerema Mcpg
Heerema Marine Contractors has ordered a motion-compensated pile gripper from Huisman for offshore wind farm construction duties.
Oct. 3, 2022
Courtesy Heerema
Floating To Floating Installation (2)
Heerema Marine Contractors has developed a new technique for installation of floating offshore wind structures.
April 25, 2022
Courtesy Fugro
Fugro’s QuickVision subsea asset positioning software.
Offshore staffLEIDSCHENDAM, the Netherlands – Heerema Marine Contractors has awarded Fugro a four-year global framework agreement. The agreement covers provision of survey and...
Feb. 25, 2022
Content Dam Os En Articles 2018 04 Heerema Withdrawing From Offshore Pipelay Leftcolumn Article Headerimage File
Heerema Marine Contractors has decided to discontinue offshore pipelay, following a review of the company’s position.
April 25, 2018

Additional content from Heerema Marine Contractors

Pennwell web 500 375
Heerema Fabrication Group is using Pyeroy scaffolding during the fabrication of the Ensign platform in Hartlepool, UK.
July 7, 2011
Heerema Marine Contractors (HMC) has appointed Bob Post as CFO and statutory director, effective Sept. 1, 2008.
June 4, 2008
Heerema Vlissingen has completed the construction of the Hasdrubal oil and gas platform.
May 21, 2008
Heerema Marine Contractors has acquired Pipeline Technique Ltd. PTL specializes in automatic pipeline welding.
April 7, 2008
Heerema Vlissingen has delivered a template for the Tombua Landana platform.
Nov. 27, 2007
Heerema Fabrication Group has agreed to acquire the entire share capital of Albert-Garaudy Consulting Engineers (AGA) with offices in Metairie, Louisiana, and Houston.