Trelleborg

Trelleborg specializes in marine and infrastructure services.

More Info on Trelleborg

Trelleborg Marine and Infrastructure provides polymer and technology solutions with the aim of advancing operational efficiency, safety and sustainability in critical marine, port and built infrastructure applications.

Articles

Courtesy Gasgrid Finland
Gasgrid Finland
There has been a shift toward more agile and decentralized LNG logistics, where FSRUs are positioned as a critical component of modern energy infrastructure.
Jan. 23, 2025
Courtesy Trelleborg Sealing Solutions
Ons For O&g
The Variseal oil and gas seal selector is an online configuration tool that allows users to quickly create a standard or custom seal proposal document for use in seal design in...
Aug. 17, 2022
Courtesy Trelleborg Marine and Infrastructure
Trelleborg Angola Fpso 1
Trelleborg Marine and Infrastructure has performed a remote installation of its navigation and piloting system SafePilot Offshore for an FPSO project offshore Angola.
July 19, 2022
(Courtesy Trelleborg)
Njordguard Trelleborg
Torgy LNG AS has commissioned Trelleborg’s applied technologies operation to provide 190 integrated cable protection systems for the Jiangsu Qidong offshore wind farm project....
Jan. 21, 2021
(Courtesy Trelleborg)
NjordGuard is an integrated cable protection system designed and developed to protect offshore wind farm power cables.
Seaway 7 has contracted Trelleborg’s applied technologies operation to provide 281 NjordGuard cable protection systems for Vattenfall’s Hollandse Kust Zuid offshore wind farm ...
Oct. 30, 2020
(Courtesy Trelleborg)
NjordGuard is an integrated cable protection system designed and developed to protect power cables in wind turbine generators and offshore substations.
Seaway 7 has contracted Trelleborg’s applied technologies operation to provide 86 integrated cable protection systems for RWE’s Kaskasi offshore wind farm in the German North ...
Oct. 23, 2020
Websiteimage Sunset
CNOOC has contracted Trelleborg’s offshore operation to supply 18 km (11 mi) of Tri-Strakes for the risers and flowlines on the Lingshui gas development off China.
March 5, 2020
(Courtesy Trelleborg)
Delivery of the elastomeric bearings began in July.
Offshore staffSTOCKHOLM, Sweden – MODEC has awarded Trelleborg’s offshore operation a fasttrack contract to produce more than 80 laminated elastomeric bearings.The bearings will...
Aug. 21, 2019
Trelleborg’s marine systems division helped guide Allseas’ Iron Lady to shore last year, while the barge was carrying the 24,200-ton topsides that the Pioneering Spirit had earlier...
Aug. 9, 2018
XR connector developed by Subsea Technologies Ltd.
Trelleborg Sealing Solutions has engineered a seal to work inside the new XR connector developed by Subsea Technologies Ltd.
July 5, 2017

Additional content from Trelleborg

FPSO BW Catcher
Trelleborg has completed design and fabrication of elastomeric bearing structures for Premier Oil’s Catcher FPSO.
April 7, 2017
Content Dam Os En Articles 2016 10 Trelleborg Delivers Floatover Components For Petronas Platform Leftcolumn Article Thumbnailimage File
Trelleborg has completed the supply of floatover equipment for Petronas’ NC3 gas field in block SK316, 200 km (124 mi) north of Bintulu, Sarawak.
Oct. 18, 2016
Trelleborg’s engineered products operation has launched a new maintenance service for boat landing systems.
Sept. 9, 2016
Trelleborg Sealing Solutions has opened a climate-controlled swivel stack seal inspection facility for validation of bespoke seals.
Jan. 11, 2016
Kvaerner has contracted Trelleborg to supply thermal insulation, corrosion and passive fire protection solutions for the Johan Sverdrup development in the central Norwegian North...
July 27, 2015
T-Strake is Trelleborg's new vortex induced vibration (VIV) suppression system.
Trelleborg has launched a new vortex induced vibration (VIV) suppression system. The new T-Strake system features a unique modular design that Trelleborg says enables more efficient...
Aug. 28, 2014
Offtrell1 1304off
Trelleborg has launched a comprehensive suite of flow control solutions designed for the subsea oil and gas market.
April 11, 2013
Trelleborg has opened a new facility in Brazil.
Oct. 10, 2012
Pennwell web 300 225
Trelleborg Offshore has revealed a new diver-friendly piggyback clamp designed to improve safety during installation.
July 12, 2011
Trelleborg Engineered Systems has agreed to acquire offshore Brazil subsidiary of Veyance Technologies Inc. .
March 14, 2011
Trelleborg Marine Systems is relocating its headquarters to Singapore.
Sept. 30, 2010
Pennwell web 170 113
Trelleborg Offshore has installed Elastopipe, a corrosion-free fire safety deluge system, on Maersk’s FPSO Ngujima-Yin off Western Australia.
Aug. 5, 2010
The companies that make up Trelleborg Offshore have been renamed, replacing the names CRP, OCP, Emerson & Cuming and Viking.
July 6, 2009
Trelleborg CRP has appointed Brian McSharry president.
May 27, 2009
Th 0707offtrell1
The Riserfin fairing launched by Trelleborg Offshore at this year’s OTC combines the benefits of efficient suppression of VIV - vortex induced vibration - with minimal drag.
July 1, 2007
Th 0703off Trell1
Petrobras has been monitoring the benefits of polymer-based fire-protection products devised by Trellebrog Offshore, part of the Trelleborg Engineered Systems group.
March 1, 2007
Th 0607off Trell1
Trelleborg Engineered Systems, which supplies products and services to the offshore sector based on its polymer rubber technology, has extended its expertise and product line ...
July 1, 2006