ABL’s survey scope expanded for Congo LNG
Eni has asked ABL to perform marine warranty survey services for the offshore transportation and installation (T&I) of the Marine XII Congo LNG development Phase 2.
The project entails fabrication and T&I of a new FLNG vessel; a converted floating separation, storage and booster unit; wellhead platforms; and associated tie-in pipelines and ancillaries to the location offshore Republic of Congo.
ABL’s scope of work includes a technical review of project and procedural documentation, drawings and calculations, the suitability surveys of the proposed marine fleet for T&I operations, and reviewing and approving onsite attendances for warranted operations.
The company has also been supporting Phase 1.
Sponsored