Offshore staff
LONDON – PowerChina HuaDong Engineering Ltd. has contracted LOC Singapore to provide marine warranty survey (MWS) services for the transportation and installation operations of the Binh Dai Phase 1 offshore wind farm in Vietnam.
Under the terms of agreement, LOC will provide MWS services, including suitability surveys of the proposed support fleet. The team will also provide expertise in a range of other marine vessel inspection and marine assurance services when necessary.
Located in the southeast area of the Vietnamese province of Ben Tre, the Binh Dai project is expected to have a total capacity of 310 MW. Phase 1 will consist of seven Siemens Gamesa turbines.
11/09/2020