Petrobras has contracted Baker Hughes to supply 77 km of flexible pipe systems for deployment in deepwater presalt fields offshore Brazil.
The multi-year program covers risers and flowlines for hydrocarbon production and associated gas and water injection, with support for equipment storage, maintenance and installation.
Deliveries should start in mid-2026; the systems will feature at the Búzios, Libra, Berbigão, Sururu and Sépia fields.
The design will also address stress-induced corrosion cracking from CO2, which can impact flexible pipes in presalt fields with high concentrations of the gas.
Baker Hughes claims its flexible pipes have a proven track record of mitigating this issue, which can occur as gas is reinjected into wells to lessen flaring and to enhance oil recovery.