Sakhalin Energy postpones 4D seismic survey

Sakhalin Energy has postponed its planned 2009 4D seismic work until 2010 after a meeting with the Western Gray Whale Advisory Panel.

Offshore staff

YUZHO-SAKHALINSK, Russia --Sakhalin Energy has postponed its planned 2009 4D seismic work until 2010 after a meeting with the Western Gray Whale Advisory Panel. Sakhalin Energy has incorporated into the survey the monitoring and mitigation plans agreed to with the Panel over the last two years.

04/24/2009

More in Geosciences