Azule Energy awards Saipem, SLB OneSubsea contracts for Angola's West Hub Tails project

Saipem will provide subsea infrastructure for the Agogo FPSO development, while SLB OneSubsea will supply controls umbilicals supporting the transfer of production from four existing fields to the new facility.

Why this news matters:

  • The West Hub Tails project is extending the productive life of existing offshore infrastructure by redirecting output from four mature Angolan fields to the newer Agogo FPSO, helping maximize recovery from the broader West Hub development.

  • New contracts for Saipem and SLB OneSubsea move the project into its execution phase, advancing subsea tiebacks and infrastructure needed to support future production offshore Angola.

 

Azule Energy has awarded contracts to Saipem and SLB OneSubsea for the West Hub Tails project offshore Angola, advancing plans to connect new subsea infrastructure and transfer production from four existing fields to the Agogo FPSO. The work forms part of the broader Agogo Integrated West Hub development in Block 15/06.

West Hub Tails enters execution phase

Azule Energy has awarded Saipem a $350 million contract for the West Hub Tails project, part of the Agogo Integrated West Hub development offshore Angola.

The development is located 180 km offshore in water depths of up to 1,750 m. Saipem's responsibilities cover engineering, fabrication, transportation and installation of subsea infrastructure, including about 62 km of flowlines, risers and umbilicals.

These will be connected to the Agogo FPSO.

Fabrication will take place at Saipem’s Ambriz yard in Angola, with the construction vessels FDS and Normand Maximus deployed for the offshore installation.

The program should take two and a half years to complete.

Agogo FPSO set to receive production from four mature fields

In addition, SLB OneSubsea will design and supply controls umbilicals for Azule Energy’s West Hub Tails project.

This involves redirecting production from the Sangos, Ochigufu, Mpungi and Vandumbu fields—hosted since 2014 by the Ngoma FPSO, but now nearing the end of its design life—to the less emissions-intensive Agogo FPSO chartered from Yinson Production.

The 120,000-bbl/d facility started service for the Integrated West Hub development in July 2025; SLB OneSubsea delivered control umbilicals for the Agogo and Ndungu tiebacks. 

Latest offshore Angola news:

The discovery, at the Vicango Este-01 exploration well in deepwater Block 15, is the third in the block in the last four years.
Sept. 10, 2026
Photo by Gwenole de KERMENGUY; Courtesy of MarineTraffic.com
Pazflor FPSO offshore Angola
TotalEnergies reported a new oil discovery on Angola's Block 17 that is set for rapid tieback development while expanding its exploration footprint with operated stakes in two...
Sept. 10, 2026
ID 155630357 © Hyotographics | Dreamstime.com
Map and flag of Angola
Etu Energias has agreed to acquire Chevron's interests in the producing Block 14 and Block 14K developments offshore Cabinda, a $250-million transaction that would make Etu the...
Sept. 1, 2026
The discovery, made at the 105-4X exploration well in Block 0, will be assessed for potential tieback opportunities.
Aug. 17, 2026
Contributors:

About the Author

Jeremy Beckman

Jeremy Beckman

Staff Writer / Editor, Europe

Jeremy Beckman has been Editor Europe, Offshore since 1992. Prior to joining Offshore he was a freelance journalist for eight years, working for a variety of electronics, computing and scientific journals in the UK. He regularly writes news columns on trends and events both in the NW Europe offshore region and globally. He also writes features on developments and technology in exploration and production.

Sign up for our eNewsletters
Get the latest news and updates