Fairfield close to sanctioning Dunlin topsides removal

Fairfield Betula is set to contract Heerema Marine Contractors and AF Gruppen to remove and dispose of the topsides of the Dunlin Alpha platform in the UK northern North Sea.
Sept. 19, 2018

Offshore staff

LEIDEN, the Netherlands – Fairfield Betula Ltd. is set to contract Heerema Marine Contractors and AF Gruppen to remove and dispose of the topsides of the Dunlin Alpha platform in the UK northern North Sea.

The scope includes engineering and preparation for the 20,000-metric ton (22,046-ton) topsides, which will be lifted off and disposed of sometime between 2021 and 2024.

09/19/2018

Sign up for Offshore eNewsletters