Rotech finishes North Sea wind farm IRM

The TRS1 controlled flow excavation tool was used to perform cable de-burial and retrenching at an offshore wind farm in the North Sea.
The TRS1 controlled flow excavation tool was used to perform cable de-burial and retrenching at an offshore wind farm in the North Sea.
Rotech Subsea

Offshore staff

ABERDEEN, UKRotech Subsea has completed a three-phase inspection, repair and maintenance (IRM) program in the North Sea.

The company mobilized its TRS1 controlled flow excavation tool to perform cable de-burial and retrenching at an offshore wind farm, supported by its new RSG1 cable grab tool.

06/19/2019

More in Subsea