Barrier, Hertel fire-proof Nigerian platform structure
Offshore staff
WALSALL, UK – Barrier Fire Protection has completed a fabrication contract in Germany for a Mobil Producing Nigeria offshore platform.
Linde, which is in charge of the project, commissioned the company and Hertel to undertake fire proofing of a 20 x 10-m steel (65.6 x 33-ft) structure that will be installed on the platform.
Ten UK-based specialists carried out the work at Linde’s fabrication facility in Bremen, using Akzo Nobel’s Chartek 1709 to protect the IGE separator skid frame from a hydrocarbon fire scenario.
08/04/2017