Aibel to conduct FEED study for Oseberg C drilling upgrades

StatoilHydro has amended its contract with Aibel for upgrading of the mudsystem on Oseberg C with a FEED study for drilling upgrades on the platform.

Offshore staff

STAVANGER -- StatoilHydro has amended its contract with Aibel for upgrading of the mudsystem on Oseberg C with a FEED study for drilling upgrades on the platform.

The work scope includes a new driller cabin, new drilling control system, and equipment upgrades for pipe handling.

Work, in cooperation with operator KCA Deutag, has begun and is scheduled for completion in February 2010.

10/07/2009

More in Company News