Skandi Angra is a Vard AH11 design with bollard pull of 280 tons and 18,000 BHP.
This is the second of a three-vessel construction contract. TheSkandi Urca was delivered in 2014, and the Skandi Paratayis scheduled for delivery in 1Q 2016. All are on long-term contracts with Petrobras.