Intervention tower delivered to Teesside

Osbit has delivered its Smart Tower System for riser-less and riser-based well to Wilton Engineering’s yard in Teesside, northeast England.

Offshore staff

NEWCASTLE-UPON-TYNE, UK – Osbit has delivered its Smart Tower System for riser-less and riser-based well to Wilton Engineering’s yard in Teesside, northeast England.

FTAI Offshore commissioned the 40-m (131-ft) tower for installation on the DP-3 vessel M/V Pride. The system allows for intervention operations in water depths of up to 1,500 m (4,921 ft).

According to Osbit, the design includes various innovations to improve operational safety, flexibility, and accessibility.

01/05/2022

Sign up for our eNewsletters
Get the latest news and updates
Subsea Tieback Forum & Exhibition
SAVE THE DATE
Subsea Tieback Forum & Exhibition
February 16 - 18, 2027
Henry B. Gonzalez Convention Center, San Antonio, TX