Malaysia terminal equipped to strip CO2 from offshore gas

Petronas has commissioned the Terengganu Gas Terminal four months ahead of schedule.

Offshore staff

KUALA LUMPUR, MalaysiaPetronas has commissioned the Terengganu Gas Terminal four months ahead of schedule.

The company describes this as a state-of-the-art facility, equipped with an in-house carbon dioxide (CO2) removal process, which should boost development of Malaysia’s offshore gas fields with a high CO2 content.

06/07/2017

More in Production