Modec contracts process modules from Aker Kvaerner
Offshore staff
LYSAKER, Norway --Moded International Llc. has signed a $13-million contract with Aker Kvaerner for process modules to go on FPSOs.
Aker Kvaerner Process Systems in Oslo, Norway, will engineer, procure, construct, assemble and test the sulfate removal unit and deaerator system. Construction, assembly, and testing are scheduled for Aker Kvaerner's Port Klang, Malaysia facility.
The FPSO is being designed for crude processing, and gas separation and compression with an oil storage capacity of 1.6 MMbbl. The FPSO is expected to start the field production in 4Q 2008.
4/19/2007
