First gas from Shamrock field delivered to market

First gas from the Shell UK-operated Shamrock field in the North Sea has been delivered to market.
May 12, 2008

Offshore Staff

LONDON -- First gas from the Shell UK-operated Shamrock field in the North Sea has been delivered to market.

The field is being developed with the Monotower platform design, which is being powered by wind and solar energy. Production throughput will average about 120 MMMcf/d of gas. Gas is transported by pipeline to the Shell-operated Bacton Gas Plant approximately 120 km (74 mi) to the southwest.

05/12/2008

Sign up for our eNewsletters
Get the latest news and updates