Panoro assessing MOPU-based development offshore Equatorial Guinea
Panoro Energy and partner GE Petrol have devised an initial development concept for the Estrella and Rodo discoveries in Block EG-23, offshore Equatorial Guinea.
The comprises four wells and a central mobile offshore production unit, or MOPU.
One development well would be drilled at Estrella, a twin of the 2001 Estrella-1 discovery well that tested at 6,780 b/d of condensate (48-50° API) and 48.7 MMcf/d of gas.
Two development wells and one water injector would be drilled at the Rodo oil discovery. Future tie-ins could follow of the Rodo NW and Riaba East prospects.
Gas/condensate production would be exported via a pipeline connection to nearby infrastructure.
The block contains five further oil, gas and gas/condensate discoveries, with other 50 MMbbl-plus exploration prospects identified nearby.
Block EG-23, previously operated by Marathon, is offshore and north of Bioko Island and adjacent to the producing Alba gas and condensate field, also developed by Marathon. Water depths range from 50-100 m.
Panoro and GEPetrol were awarded the block for an initial three-year term. They will then have an option to enter into a further two-year period, conditions for which include drilling of an exploration well.
About the Author
Jeremy BeckmanJeremy Beckman
Staff Writer / Editor, Europe
Jeremy Beckman has been Editor Europe, Offshore since 1992. Prior to joining Offshore he was a freelance journalist for eight years, working for a variety of electronics, computing and scientific journals in the UK. He regularly writes news columns on trends and events both in the NW Europe offshore region and globally. He also writes features on developments and technology in exploration and production.
Related



