Mustang to tackle Belinda FEED

Noble Energy has contracted Mustang to perform front-end engineering design (FEED) for the Belinda project in Block `O’ offshore Equatorial Guinea.

Offshore staff

HOUSTON -- Noble Energy has contracted Mustang to perform front-end engineering design (FEED) for the Belinda project in Block `O’ offshore Equatorial Guinea.
The scope includes the design of the jacket and topsides for the offshore facility, in 243 ft (74 m) of water, which will process gas condensate. Belinda is being designed as a gas cycling project to extract the field’s condensate and re-inject the gas for future sales.

05/03/2010

More in Field Development