FMC Technologies wins Peregrino wellheads contract

StatoilHydro has awarded FMC Technologies a $30 million contract for the manufacture and installation of surface wellheads and surface production trees for the Peregrino project.

Offshore staff

HOUSTON -- StatoilHydro has awarded FMC Technologies a $30 million contract for the manufacture and installation of surface wellheads and surface production trees for the Peregrino project.

Located in approximately 400 ft (120 m) of water offshore Brazil in the Campos basin, Peregrino will be completed in three phases and includes approximately 60 wells.

FMC’s contract supports phase one of the project, which includes 30 production wells and seven injection wells. The equipment will be manufactured at FMC's facility in Rio de Janeiro. Deliveries are expected to begin in 1Q 2010.

06/03/2009

More in Field Development