Offshore Staff
STAVANGER -- StatoilHydro ASA has received consent to use the Oseberg D wells, subsea template, and manifold with associated pipelines, between the template and the Oseberg field center.
Oseberg D is being developed with a subsea installation with four well slots that will be tied back to the Oseberg D facility by two pipelines.
First production is expected in March 2008.
02/21/2008