After a year and a half of effort in Valhall field, BP Norge and its partners Amerada Hess, Shell, and Total have proven the concept of permanently installed seismic sensors for definition and monitoring of oil reservoirs.

After a year and a half of effort in Valhall field, BP Norge and its partners Amerada Hess, Shell, and Total have proven the concept of permanently installed seismic sensors for definition and monitoring of oil reservoirs. In December 2002 the decision was made to trench and bury 120 km of OYO-built seismic cable containing 10,000 sensors in a 45 sq km area across the crest of the Valhall structure. In September 2004 the system became operational.

The Valhall field has significant imaging problems that the buried sensor system is designed to overcome. The top of the structure is highly faulted allowing gas to move upward through the section, which creates an image-distorting gas cloud above the reservoir. This makes imaging the oil producing rock horizons extremely difficult. In addition, the reservoir is a weak chalk rock, which compacts with oil production and creates subsidence at the mudline. The weak rock also creates drilling problems for the field's active drilling program.

The sensors show good signal repeatability and good multiple suppression by summing the hydrophone and vertical geophone signals. Each survey gathers 7 terabytes of data from 53,000 individual shots produced by an airgun-vessel.

The presenter, Olav Bankved of BP Norge, said that the shear wave data volume will be ready later this year to correct the gas-cloud problem. The high-quality, four-component surveys produced by the array will be used to monitor reservoir health and producibility through 4D surveys. They will also guide well planning and perforation placement.