Deepwater Horizon: LMRP Cap Installation Process (VIDEO)

As work continues to install the LMRP cap, this video animation illustrates how it will be connected to the drillship riser, prepped, maneuvered into position, and installed on top of the BOP stack.
As work continues to install the LMRP cap, this video animation illustrates how it will be connected to the drillship riser, prepped, maneuvered into position, and installed on top of the BOP stack.
Source: Deepwater Horizon Joint Information Center.
Sign up for our eNewsletters
Get the latest news and updates
Subsea Tieback Forum & Exhibition
SAVE THE DATE
Subsea Tieback Forum & Exhibition
February 16 - 18, 2027
Henry B. Gonzalez Convention Center, San Antonio, TX