Snøhvit shutdown planned for equipment replacement

Production from the Snøhvit field in the Barents Sea is due to stop on Oct. 4 for a planned 30 days to replace two heat exchangers at the gas liquefaction plant, according to StatoilHydro.

Offshore staff

OSLO -- Production from the Snøhvit field in the Barents Sea is due to stop on Oct. 4 for a planned 30 days to replace two heat exchangers at the gas liquefaction plant, according to StatoilHydro.

10/03/2008

More in Equipment Engineering