Petrobras brings third well online at Sapinhoá offshore Brazil

April 7, 2014
Petrobras has started up 7-SPH-04-SPS, the third production well of the Sapinhoá Pilot Project in the Santos basin presalt region.

Offshore staff

RIO DE JANEIROPetrobras has started up 7-SPH-04-SPS, the third production well of the Sapinhoá Pilot Project in the Santos basin presalt region. Water depth is 2,120 m (6,954 ft).

The well, which has an estimated production potential of 26,000 b/d, is connected to the FPSOCidade de São Paulo through a buoyancy supported risers (BSR) system.

It is the second well connected via the BSR gathering system following the start-up ofwell SPS-77A in February.

FPSOCidade de São Paulo, which started operating in January 2013, has the capacity to process up to 120,000 b/d of oil.

A fourth production well will be brought onstream early in the second half of this year, at which point the platform will reach its full output capacity.

04/07/2014