Stay Connected

Shell contracts subsea umbilicals from Aker

Offshore staff

LYSAKER, Norway – Shell Offshore Inc. has signed three contracts for subsea work with Aker Solutions. The work will be on Popeye and Europa fields in the Gulf of Mexico.

Aker is to deliver 40 km (25 mi) of electro-hydraulic steel tube umbilicals, and will install the umbilical for Popeye using the Boa Sub C installation vessel. Engineering, project management, and manufacturing will be done in Mobile, Alabama.

Popeye is in Green Canyon block 116 in approximately 671.6 m (2,200 ft) water depth and will tieback to the Cougar fixed platform in South Timbalier block 300 in 110.3 m (362 ft) water depth.

The Europa A7 well is in Mississippi Canyon block 935 in approximately 1,143 m (3,750 ft) water depth and will tieback to existing Europa subsea structure. The Europa development ties back to the Mars TLP in Mississippi Canyon block 807 in 896 m (2,940 ft) water depth.

10/08/2010

Related Articles

CSA Ocean Sciences awarded Gulf of Mexico BOEM contract

Nov 22, 2013 The Bureau of Ocean Energy Management has awarded CSA Ocean Sciences a contract for conducting measurements and modeling of the underwater pressure waves produced during explosive well decommission...

BSEE cites 12 operators for SEMS violations, stops operations on five of them

Nov 22, 2013 The Bureau of Safety and Environmental Enforcement (BSEE) has cited 12 offshore operators for failing to demonstrate compliance with the Safety and Environmental Management Systems requirements of ...

Trending News

Chevron drillship Pacific Sharav arrives in Gulf of Mexico

Oct 20, 2014

Chevron Corp. reports that the deepwater drillship Pacific Sharav has arrived in the Gulf of Mexico to work under a five-year contract with Pacific Drilling.

BOEM proposes Gulf of Mexico oil and gas lease sale

Oct 20, 2014

The Bureau of Ocean Energy Management (BOEM) will offer 40 million acres offshore Louisiana, Mississippi, and Alabama for oil and gas exploration and development in a sale that will include all available unleased areas in the Central Gulf of Mexico Planning Area.

SBM Offshore launches Imodco Terminals and Imodco Services

Oct 20, 2014

SBM Offshore announces that, to meet the challenges of the dynamic market for catenary anchor leg mooring (CALM) terminals and after sales services, two independent entities – Imodco Terminals SA and Imodco Services SA – have been created.

Songa Offshore SE provides Songa Dee SPS update

Oct 20, 2014

Songa Offshore SE says that the scope of work for the Songa Dee special periodic survey has progressed according to plan, including the budget of 60 days and $90 million.

COSCO offers update on Sevan 650 drilling unit

Oct 20, 2014

COSCO Corp. (Singapore) Ltd. reports that COSCO (Qidong) Offshore Co. Ltd. and Sevan Drilling Rig VI Pte. Ltd. (shipowner) have agreed to defer delivery date of Sevan Developer for 12 months, with options exercisable at six-month intervals, to extend the delivery date up to a total of 36 months from Oct. 15.

  Offshore
Digital Magazine
Look Inside
Cover
Current Issue

Oil & Gas Jobs

View more Job Listings >>