Petrobras secures subsea pipe suppliesPetrobras has awarded Technip a five-year frame agreement to supply 1,400 km (870 mi) flexible pipes. |
New pile installation method succeeds offshore BrazilWorking in Waimea field offshore Brazil in the Campos basin, Large Diameter Drilling Ltd. has completed its first offshore pile installation using its StabFrame. |
Buoyancy modules aid ROV deployments off BrazilSMD has contracted Trelleborg Offshore for syntactic foam buoyancy modules for 20 new work-class ROVs. |
Petrobras contracts Subsea 7 for SURF work in Campos basinSubsea 7 SA has announced award of a $200-million SURF (subsea umbilical riser and flowline) contract from Petróleo Brasileiro. |
Subsea 7 gets Petrobras contract, orders newbuild pipelay vesselPetrobras has awarded Subsea 7 SA a five-year contract to provide a dedicated deepwater flexible pipelay vessel for use offshore Brazil. |
Trelleborg, Landing String to debut new drill pipe buoyancy systemTrelleborg says it plans to debut the world’s first buoyancy module system on a drill pipe landing string in Rio de Janeiro. |
Lankhorst to supply VIV strakes to Petrobras' P-55Saipem do Brasil has contracted Lankhorst Mouldings Offshore Division to supply vortex induced vibration (VIV) suppression strakes for the risers at Petrobras’ P-55. |
GE Oil & Gas to supply subsea and surface equipment for OGXGE Oil & Gas has been awarded a contract from OGX Petróleo e Gás Ltda. to supply drilling and production equipment for three offshore fixed production platforms to be deployed in the Waimea and Waikiki oil and gas fields of the Campos basin, offshore Brazil. |
Riser monitoring evolving to suit new deepwater configurations
Structural monitoring plays a vital role as operators drive out into greater water depths with ever more complex production riser configurations.
|
Tui subsea development plans taking shape
Preliminary "in-house" reserves estimates of the Tui oil fields by AWE indicate that initial proved + probable (2P) reserves recoverable from the fields will be reduced from the previously reported 50.5 MMbbl.
|
Steel Catenary Risers for High Pressure High Temperature Development
Please join industry expert Dr. Rupak Ghosh, riser/flowline lead engineer, ExxonMobil Development Company, to hear the latest developments in high-...
Sponsored by
|
Offshore Top 5 Projects - 2011
Find out which projects received this prestigious recognition in the Top 5 Projects for 2011, and learn how the industry: is applying the late...
Sponsored by
|
Meeting the Challenges of Arctic Development
Arctic oil and gas resources represent the next big chapter in offshore development. Yet, the development of these resources remains challenging ...
Sponsored by
|
Improving Safety in Oil and Gas Production
The recent outbreak of accidents in the O&G industry is spawning increased concern for plant and personnel safety. Lost revenues amounting to billions of dollars, increasing C-level culpability, and new safety related regulations will drive the need for more safety solutions.
Transmit...
|