Offshore staff
MARSEILLE, France – Total Gabon has contracted BOURBON for offshore pipelay as part of the Hylia water injection project.
The scope covers engineering, procurement, construction, and installation of 25 km (15.5 mi) of 6-in. rigid pipeline using Zap-Lok technology.
BOURBON is subcontractingCortez Subsea for pipelay equipment and Wood Group for the pipeline design and pipelay engineering.
Operations are due to start in 2Q using a multi-purpose platform supply vessel from the Bourbon Evolution 800 series.
In addition,BOURBON will provide ROV services to support the survey and an air diving team for spool and riser installation.
02/14/2017