Enterprise orders pipe for Lucius oil export line in GoMEnterprise Products Partners L.P. has ordered 105 mi (169 km) of 42-inch pipe from Tata Steel for a new crude oil export pipeline in the Gulf of Mexico. |
Discovery Gas Transmission to add to deepwater GoM facilitiesFoster Wheeler Upstream (FWLT:NASDAQ GS) has won a contract from Discovery Gas Transmission for design engineering and technical services for a junction platform, facilities, and associated pipelines within Discovery’s South Timbalier 283 Gulf of Mexico system. |
McDermott signs agreement for spool base services in Gulf of MexicoMcDermott International, Inc. says it has signed a 10-year frame agreement with Helix Subsea Construction, Inc. for spool base services in the Gulf of Mexico. |
Deepwater GoM gas pipeline to be builtWilliams Partners and DCP Midstream Partners plan to expand the Discovery natural gas gathering pipeline in the deepwater Gulf of Mexico. |
Enterprise, Genesis Energy to build crude oil gathering pipeline in deepwater Gulf of MexicoEnterprise Products Partners L.P. and Genesis Energy have executed crude oil transportation agreements with a consortium of six Gulf of Mexico producers. |
TDW completes deepwater pipeline isolation in GoMTDW Offshore Services L.L.C. has successfully completed a pipeline pressure isolation operation in the Gulf of Mexico for a major operator. |
Looming SEMS rules will require new strategiesThe 2010 Macondo oil spill in the Gulf of Mexico led to a number of investigations, reactions, and conclusions about the future of the US oil and gas industry, particularly regarding safety standards. In light of this, the Bureau of Ocean Energy Management Regulations and Enforcement (BOEMRE) created new regulations with the aim of enhancing safety standards. |
SolveiG set to join Norway pipeline groupStatoil is selling a 24.1% direct and indirect stake in the Gassled pipelines joint venture to SolveiG Gas Norway for NOK 17.35 billion ($3.2 billion). |
New hydrate skid offers deepwater remediation optionA new hydrate remediation system from Wright’s Well Control Services (WWCS) recently cleared a hydrate-blocked pipeline in the Gulf of Mexico (GoM) in 7,200 ft (about 2,100 m) of water. According to Wright’s President David C. Wright, the WWCS skid provides previously unavailable functionality, as it does not depend on hydraulic energy from an ROV. |
McDermott wins pipeline installation contract from PemexMcDermott says that it has been awarded a contract by Pemex Exploración y Producción for procurement, construction and installation of three oil and gas pipelines in Mexico’s Bay of Campeche. |
Mobility for Real-time Asset Management on the Rig
Learn how to collaborate and conduct remote access of data and personnel with mobility using DOFERO’s customized HMI solution and ruggedized Class ...
Sponsored by
|
Steel Catenary Risers for High Pressure High Temperature Development
Please join industry expert Dr. Rupak Ghosh, riser/flowline lead engineer, ExxonMobil Development Company, to hear the latest developments in high-...
Sponsored by
|
Offshore Top 5 Projects - 2011
Find out which projects received this prestigious recognition in the Top 5 Projects for 2011, and learn how the industry: is applying the late...
Sponsored by
|