Oil & Gas Pipeline & Transportation: Middle East

FSU receives production from Persian Gulf oil fields

Iran Offshore Oil Co. has started operations at a 2.2-MMbbl floating storage unit/export terminal in the Persian Gulf’s Bahregan region.

Caspian operator contracts Saipem for Kashagan pipeline project

The North Caspian Operating Co. has awarded Saipem a $1.8-billion engineering and construction contract for the Kashagan field project in the Kazakh waters of the Caspian Sea. 

Nasr oil field offshore Abu Dhabi sees first production

Japan Oil Development Co. Ltd. (JODCO) has started oil production from the Nasr oil field offshore Abu Dhabi, the United Arab Emirates.

Cyprus responds on Leviathan gas talks

Delek Group’s gas subsidiaries have accepted a request from DEFA, a state gas company owned by the government of Cyprus, to postpone the period of validity of a proposal to supply gas though pipelines from the Leviathan field offshore Israel.

Black Sea gas pipeline study approaches FEED stage

Gazprom has held talks with the Turkish Ministry of Energy and Natural Resources on the proposed new gas pipeline across the Black Sea toward Turkey.

Iran denies South Pars gas leak

Sour gas production has not been interrupted at the South Pars field Phase 15 platform in the Persian Gulf, according to news service Shana.

Nexans dispatches first Shah Deniz Stage 2 DEH cables

Nexans has delivered its first subsea direct electrical heating (DEH) system consignment to BP for use in the Shah Deniz Stage 2 project in the Azeri sector of the Caspian Sea.

UAE/India group to revamp Mumbai High North

ONGC has awarded a consortium of Valentine Maritime and Indian contractor Supreme Offshore Construction & Technical Services a $215-million contract for the MHNRD Phase III pipeline project for the Mumbai High North field in the Arabian Sea. 

Unique Wellube to supply ADMA-OPCO with seal plugs

Abu Dhabi Marine Operating Co. (ADMA-OPCO) has contracted Unique Wellube, a division of Unique Maritime Group, for the supply and engineering of mechanical seal plugs for a significant pipeline isolation project.

Phase 22 pipeline in place at South Pars field offshore Iran

Iranian Offshore Engineering and Construction Co. (IOEC) has completed 110 km (68 mi) of subsea pipelay operations at the South Pars gas field Phase 22 development in the Persian Gulf.

Webcasts

Standardization of Offshore Production Systems

The EPC strategy and an update on the construction of the eight units will be presented as well as an overview of future opportunities.

Sponsored by

Frac Smarter with Hydrocarbon Tracers

Water, Oil & Gas phase tracers applied during the hydraulic stimulation can tell you how your wellbore is producing.

Sponsored by

Offshore Top 5 Projects - 2014

The editors of Offshore have made their choices for the winners of the Five Star Award – the top five offshore field development projects for 2014....

You're stuck at 24K feet in 6,500 feet of water. What now?

Join us to learn about a revolutionary advance in free-point technology that can identify a stuck point 50% faster with single trip operation: ...
Sponsored by
Advertisement