Newfield expects to increase its Gulf of Mexico production by more than 60% this year.
Superior Energy Services now owns Shell's Gulf of Mexico Bullwinkle platform and related assets.
The falling costs of building and operating upstream oil and gas facilities may be close to a reversal, according to a study by IHS Cambridge Energy Research Associates (CERA) just announced.
Bluewater Industries has contracted Clough to provide installation support services for the ATP Telemark Hub project in the Gulf of Mexico.
Chevron USA has awarded FloaTEC a contract for the front-end engineering and design (FEED) of the hull, mooring, and risers for the Big Foot development facility in Gulf of Mexico.
The floating deepwater drilling and production facility ATP Titan has sailed out of Gulf Marine Fabricator’s dock near Aransas Pass, Texas, according to ATP Oil & Gas.
Chevron USA has awarded KBR a contract for the front-end engineering and design (FEED) of the topsides for the proposed Big Foot development facility in the Gulf of Mexico.
ATP Titan, the first deepwater drilling and production facility built in the US, was christened at Gulf Island Fabrication’s south yard in Ingleside, Texas, on Aug. 26.
The US Department of the Interior’s Minerals Management Service (MMS) has received Shell Offshore’s exploration plan to explore two leases in the Beaufort Sea and has deemed the plan “complete.”
J. Ray McDermott has completed building the Maloob-C drilling platform for PEMEX Exploración y Producción (PEMEX).
| Drilling & Completion | Pipeline & Transportation |
| Field Development | Production |
| Subsea | Rigs/Vessels |
| Geology & Geophysics | |
|
Chemical processing: 6 steps to condition-based maintenance
An exciting trend in the world of CMMS is the increasing sophistication of condition-based maintenance features and functions vendors offer and maintenance professionals ... Sponsored By:
Infor
|