White ribbon of new LA 1 taking shape near Fourchon
- Construction of a two-lane elevated highway from Golden Meadow to Leeville (8.3 mi)
- Pre-construction began: 2004
- Construction period: 2006-2011.
Phase 3 ($340 million)
- Construction of four-lane at-grade highway from Larose to US 90, including overpasses over Intracoastal Waterway and Bayou Lafourche (19.5 mi).
Phase 4 ($580 million)
- Construction of an additional two lanes of elevated highway from Golden Meadow to Port Fourchon
- Highway widening and upgrades from Port Fourchon to Grand Isle.
Total Cost: $ 1.489 billion
Previous Page
Page 4 of 4
Volume 68 Issue 3
March 2008