Offshore staff
TEHRAN, Iran – Phases 17 and 18 of the South Pars field development in the Persian Gulf are nearing first gas production.
According to news service Shana, the Phase 17 platform is in its pre-commissioning stage and will deliver sour gas by January 2015.
The two phases combined are expected to produce 50 MMcm/d (1.77 tcf/d) of natural gas, 80,000 b/d of gas condensate, and 400 tons/d of sulfur.
Both are operated by a consortium of Industrial Development and Renovation Organization (IDRO), Iranian Offshore Engineering and Construction Co. (IOEC), Oil Industries Engineering and Construction Co. (OIEC), and SADRA Co.
11/05/2014