Stay Connected

US Deputy Secretary Connor visits Gulf Coast to discuss offshore production, Gulf restoration

Offshore staff

NEW ORLEANS, Louisiana – As part of the Obama Administration’s all-of-the-above energy strategy to continue to expand safe and responsible domestic energy production, Deputy Secretary of the Interior Mike Connor visited New Orleans, Louisiana, where he participated in the Administration’s Quadrennial Energy Review (QER), visited oil and gas production facilities, and joined a roundtable discussion on Gulf Coast restoration.  

“The Gulf of Mexico is a critical component of our nation’s domestic energy portfolio, and we are committed to working with industry, state officials, and local communities to improve and safeguard the infrastructure that supports the region’s production and distribution systems,” Deputy Secretary Connor said. “I look forward to continuing to work with the various stakeholders as we identify threats, reduce vulnerabilities, increase resilience, and strengthen response and recovery efforts.”

Deputy Secretary Connor joined Secretary of Energy Ernest Moniz and US Senator Mary Landrieu at the May 27 Quadrennial Energy Review stakeholder meeting at Louisiana State University, which focused on petroleum transmission, storage, and distribution issues.

Coordinated by the US Department of Energy, President Obama established the QER in a Jan. 9 Presidential Memorandum to provide a multiyear roadmap that outlines federal energy policy objectives, legislative proposals to Congress, executive actions, an agenda for research, development, and demonstration programs and funding, and financing and incentive programs. The President’s Climate Action Plan calls for the initial review to focus on energy infrastructure – the network for transporting, transmitting, storing, and delivering energy – and identify the threats, risks and opportunities for US energy and climate security, enabling the federal government to translate policy goals into a set of integrated actions.

While in Louisiana, Connor traveled to Port Fourchon, a multi-use facility serving as a land-base for offshore deepwater oil and gas activities, currently servicing 90% of deepwater structures in the Gulf of Mexico. Connor also visited the Caminada Headland Barrier Island Restoration Project. The National Fish and Wildlife Foundation recently provided an additional $144.5 million to the Louisiana Coastal Protection and Restoration Authority to fund the second phase of this critical beach and dune restoration work.

The tour of the project followed a roundtable discussion yesterday to review ongoing Gulf coast restoration efforts for natural resources damaged by the 2010 Deepwater Horizon oil spill. More than two dozen groups, representing a broad-based coalition working to restore marshes, barrier islands, dunes and shorelines, participated in the informal discussion, including local and national environmental groups, the offshore industry and regional economic development organizations.

Interior agencies have been working on Gulf Coast restoration projects with other federal, state, tribal, and private sector partners and Gulf residents as part of the Deepwater Horizon Natural Resources Damage Assessment Trustee Council. The goal of the recovery projects implemented by the trustees is to restore, replace, rehabilitate, or acquire the equivalent of the impacted resources.  

Related Articles

Pemex to invest $6B in Cantarell production

Jul 3, 2014

Pemex plans to launch a $6 billion investment in 2017 to maintain current levels of production at its Cantarell field over the next decade, Reuters reports.

Freeport-McMoRan completes acquisition of deepwater GOM interests

Jul 2, 2014

Freeport-McMoRan Oil & Gas has completed its acquisition of certain of Apache Corp.’s interests in the deepwater Gulf of Mexico.

Dynamic Industries wins deck extension LP piping and support

Jul 2, 2014 Dynamic Industries Inc., a fabrication and service provider to the global oil, gas, and energy industries, has won a contract for the fabrication of deck extension LP piping and supports. The contr...

Talos buys GoM shelf properties from Stone Energy

Jul 2, 2014

Talos Energy has agreed to buy conventional Gulf of Mexico shelf properties from Stone Energy Corp. (NYSE:SGY) for $200 million.

GE to supply PEMEX with equipment for GoM wells

Jun 26, 2014

GE Oil & Gas will provide vital surface equipment to PEMEX for use at its offshore project in the Ayatsil heavy oil field located in the Campeche Sound, in the Gulf of Mexico.

Trending News

Development of a subsea recommended safety practice

Oct 17, 2014

API RP 14C has long been the standard for "Analysis, Design, Installation, and Testing of Basic Surface Safety Systems for Offshore Production Platforms."

People

Oct 17, 2014

Reservoir conditions, flow regimes challenge measurement accuracy-full

Oct 17, 2014

Multi-phase meters play an increasingly important role – from royalty and fiscal allocation to production control, prevention of water encroachment, and the generation of real-time well data to help diagnose and optimize well performance. Yet, as multi-phase meters continue to increase their market penetration, more challenges arise.

Subsea power grid accelerating transfer of topsides functions to seafloor

Oct 17, 2014

Siemens is close to completing an initial test program on the four main components of a proposed subsea power distribution hub. The Subsea Power Grid will be connected on the seafloor to an array of new equipment emerging for subsea production, processing, and boosting. This should facilitate expansion of field development into deeper water, longer step-outs, and more demanding production environments.

Industry shows renewed interest in float-over installation-full

Oct 17, 2014

Float-over installation has become an attractive alternative to heavy-lift crane installation for offshore construction, as increasing size and weight of offshore platform topsides continually exceed the lifting capacity of cranes. Dockwise Ltd. analyzed topsides installation trends from 2005 to 2012, and found that the demand for cost-effective and more flexible alternatives to crane installations has been the driving force behind float-over installation using semisubmersible heavy transport vessels.

  Offshore
Digital Magazine
Look Inside
Cover
Current Issue

Oil & Gas Jobs

Search More Job Listings >>