Cendor floater installed offshore Malaysia

May 12, 2014
The FPSO for the second phase of the Cendor field development on block PM304 offshore Malaysia was moored on location in early April, according to Petrofac.

Offshore staff

LONDON – The FPSO for the second phase of the Cendor field development on block PM304 offshore Malaysia was moored on location in early April, according to Petrofac.

Commissioning is on schedule and firstproduction is expected to follow later this year.

At theWest Desaru field on the same block, which came onstream last August, eight wells are now tied in and producing, Petrofac says, with water injection and gas lift facilities undergoing commissioning.

05/12/2014