HRT spuds first of three wells in deepwater offshore Namibia

Offshore staff

RIO DE JANEIRO – The semisubmersible Transocean Marianas has spudded the Wingat-1 well offshore Namibia for HRT Walvis Petroleum (Proprietary).

The well targets the Wingat prospect on petroleum exploration license 23 in the Walvis basin, 200 km (124 mi) northwest of Walvis Bay. Water depth is 1,034 m (3,392 ft).

HRT is targeting an elongated combination trap with a potential P10 area of 381 sq km (147 sq mi), including a four-way structural closure of 42 sq km (16 sq mi). The main objective is to test the resource potential of the Albian carbonate platform, which has a well-defined seismic amplitude anomaly in the PSDM 3D data set.

Reservoirs will likely be encountered at 3,950 m (12,959 ft) below sea level. Wingat-1 will be drilled to a projected TD of 4,100 m (13,451 ft), with total drilling time estimated at 60 days.

This is the first of three back-to-back wells for HRT, in partnership with Portugal’s GALP Energia.

3/28/2013

Offshore Namibia

Related Articles

OWA 2015: Sustainable development in the Nigerian oil and gas sector

Jan 21, 2015 Akintayo Blessing, business development executive of Richardson Oil and Gas Ltd., will discuss the need for community participation in the design, monitoring, and execution of community projects in...

Lekoil revises Otakikpo oil reserves offshore Nigeria

Jan 21, 2015

Lekoil (AIM: LEK) has received an addendum to the Competent Persons Report on the Otakikpo marginal field by AGR TRACS International Ltd. 

OWA 2015: SPDC employs new index system to measure and improve corporate social responsibility

Jan 21, 2015 Nedo Osayande, general manager of Shell Petroleum Development Co., will contend that a business case and justification for continued support for CSR initiatives require some evidence that demonstra...

OWA 2015: Subsea support cluster assessment of Nigeria’s offshore sector

Jan 20, 2015 Dr. Chinedum Onyemechi, senior lecturer at the Federal University of Technology Owerri, Nigeria, will discuss the study that aims to initiate an economic research model that would trigger better ec...

OWA 2015: The critical success factors in managing West Africa’s major projects

Jan 20, 2015 Damiebi Denni-Fiberesima, principal engineer of SPDCe, will determine and discuss the prerequisite of successful major project outcomes in West Africa, as well as identifying the critical success f...

Trending News

Another well goes onstream at Maari offshore New Zealand

May 22, 2015

Cue Energy says the Maari MR7A development well is onstream offshore New Zealand.

Subsea equipment monitoring technology to be trialed in North Sea

May 22, 2015

An unnamed sponsor of a joint industry project to develop the company’s V-IR subsea integrity monitoring system has committed to deploy V-LIM line insulation monitor units in various North Sea fields.

MEG flow meters head to Ichthys

May 22, 2015

Litre Meter has dispatched 45 positive displacement flow meters to the Ichthys LNG project in the Browse basin off Western Australia via the company’s South Korean distributor S-TEK.

Safe Bristolia returning to UK North Sea following repairs

May 22, 2015

BG Group has agreed to a revised schedule of work for the accommodation support vessel Safe Bristolia at the Everest platform in the UK North Sea.

Online exclusive: Oil and gas M&A activity on the uptick in 2015

May 21, 2015

While this year is likely to see a renewed level of mergers and acquisitions activity across the oil and gas sector globally, 1Q 2015 witnessed stalled activity due to a low oil price environment. 

  Offshore
Digital Magazine
Look Inside
Cover
Current Issue

Oil & Gas Jobs

Search More Job Listings >>