Aker to supply umbilicals to ExxonMobil’s deepwater Erha field offshore Nigeria

Offshore staff

LYSAKER, Norway – ExxonMobil has contracted Aker Solutions to supply subsea umbilicals for Erha North Phase 2 offshore Nigeria.

Aker Solutions' scope of work includes the delivery of two dynamic and two static steel tube umbilicals, at a total length of 16.5 km (10.25 mi). The umbilicals will be delivered in 2014. 

Erha North Phase 2 is an extension of the existing Erha subsea system and infrastructure located 97 km (60 mi.) offshore Nigeria in water depths between 1,000 and 1,200 m (3,280 and 3,935 ft.).

The umbilicals will be designed, engineered, and manufactured at Aker Solutions' facility in Mobile, Alabama, supported by project management and engineering by a local team in Lagos, Nigeria.

3/15/2013

Aker will supply umbilicals from its Alabama plant
Aker will supply umbilicals from its Alabama plant

Related Articles

OWA 2015: Sustainable development in the Nigerian oil and gas sector

Jan 21, 2015 Akintayo Blessing, business development executive of Richardson Oil and Gas Ltd., will discuss the need for community participation in the design, monitoring, and execution of community projects in...

Lekoil revises Otakikpo oil reserves offshore Nigeria

Jan 21, 2015

Lekoil (AIM: LEK) has received an addendum to the Competent Persons Report on the Otakikpo marginal field by AGR TRACS International Ltd. 

OWA 2015: SPDC employs new index system to measure and improve corporate social responsibility

Jan 21, 2015 Nedo Osayande, general manager of Shell Petroleum Development Co., will contend that a business case and justification for continued support for CSR initiatives require some evidence that demonstra...

OWA 2015: Subsea support cluster assessment of Nigeria’s offshore sector

Jan 20, 2015 Dr. Chinedum Onyemechi, senior lecturer at the Federal University of Technology Owerri, Nigeria, will discuss the study that aims to initiate an economic research model that would trigger better ec...

OWA 2015: The critical success factors in managing West Africa’s major projects

Jan 20, 2015 Damiebi Denni-Fiberesima, principal engineer of SPDCe, will determine and discuss the prerequisite of successful major project outcomes in West Africa, as well as identifying the critical success f...

Trending News

BSEE, USGC respond to Energy XXI platform fire

Jan 23, 2015

The Bureau of Safety and Environmental Enforcement (BSEE) is responding to a damaged unmanned platform in South Timbalier block 27 in the Gulf of Mexico.

OneSubsea announces Jack/St. Malo involvement

Jan 23, 2015

Chevron Corp. recently achieved first oil from the Jack and St. Malo fields in the Gulf of Mexico. OneSubsea, a Cameron and Schlumberger company, supplied the subsea production and processing systems for these deepwater fields.

New Saudi King pledges continuity in energy and foreign policies

Jan 23, 2015

As King Abdullah bin Abdulaziz was laid to rest and his brother Salman became king of the world’s top oil exporter, Brent crude oil rose on Friday to a high of $49.80, up $1.28/bbl, before easing to around $49.20.

UK government steps up consultations on offshore tax relief

Jan 23, 2015

Oil & Gas UK has welcomed a further consultation by Britain’s government on a basin-wide UK offshore investment allowance.

Petrobras hails lower-cost subsea tree deployment

Jan 23, 2015

Petrobras says it deployed its first wet christmas tree at the end of last year using cables in the presalt area of the Santos basin.

  Offshore
Digital Magazine
Look Inside
Cover
Current Issue

Oil & Gas Jobs

Search More Job Listings >>