Stay Connected

FoundOcean completes GoM pipeline grout job for Saipem

Offshore staff

MARLOW, UK – FoundOcean has completed installation and grouting for a clamp repair on an 18-in. pipeline in the Gulf of Mexico under contract from Saipem America.

The seabed a water depth of 750 m (2,460 ft) was dredged at around the damaged area of the pipeline. An ROV maneuvered the two steel half-shells of the clamp into position and pre-tightened the bolts. FoundOcean then connected the hose to the inlet valve on the clamp and delivered the grout using its deepwater grouting umbilical system. Due to the extra load, a fabric formwork was installed under the clamp to provide more support.

In total 28 metric tons (30.86 tons) of cement was used: 4 metric tons (4.4 tons) for the clamp and 24 metric tons (26.46 tons) for the fabric formwork.

The pipeline damage resulted from an anchor drag during bad weather.

2/25/2013

Related Articles

Mad Dog Platform. Photo courtesy BP

BP adds two drilling rigs in deepwater Gulf of Mexico

Nov 20, 2013

BP has added two drilling rigs to the deepwater Gulf of Mexico, bringing its fleet there to a company record of nine rigs.

EMAS AMC selects Delta SubSea for ROV services in Gulf of Mexico

Nov 19, 2013

EMAS AMC has selected Delta SubSea to provide ROV services in support of EMAS’s current Gulf of Mexico deepwater repair campaign. 

Trending News

Chevron drillship Pacific Sharav arrives in Gulf of Mexico

Oct 20, 2014

Chevron Corp. reports that the deepwater drillship Pacific Sharav has arrived in the Gulf of Mexico to work under a five-year contract with Pacific Drilling.

BOEM proposes Gulf of Mexico oil and gas lease sale

Oct 20, 2014

The Bureau of Ocean Energy Management (BOEM) will offer 40 million acres offshore Louisiana, Mississippi, and Alabama for oil and gas exploration and development in a sale that will include all available unleased areas in the Central Gulf of Mexico Planning Area.

SBM Offshore launches Imodco Terminals and Imodco Services

Oct 20, 2014

SBM Offshore announces that, to meet the challenges of the dynamic market for catenary anchor leg mooring (CALM) terminals and after sales services, two independent entities – Imodco Terminals SA and Imodco Services SA – have been created.

Songa Offshore SE provides Songa Dee SPS update

Oct 20, 2014

Songa Offshore SE says that the scope of work for the Songa Dee special periodic survey has progressed according to plan, including the budget of 60 days and $90 million.

COSCO offers update on Sevan 650 drilling unit

Oct 20, 2014

COSCO Corp. (Singapore) Ltd. reports that COSCO (Qidong) Offshore Co. Ltd. and Sevan Drilling Rig VI Pte. Ltd. (shipowner) have agreed to defer delivery date of Sevan Developer for 12 months, with options exercisable at six-month intervals, to extend the delivery date up to a total of 36 months from Oct. 15.

  Offshore
Digital Magazine
Look Inside
Cover
Current Issue

Oil & Gas Jobs

View more Job Listings >>