SSTB 2012: Cameron features STM-15 subsea wellhead system

Offshore staff

GALVESTON, Texas – Subsea Tieback exhibitor Cameron is featuring its STM-15 Type DW5 15,000 psi WP Subsea Wellhead System on the exhibition floor. The STM-15 is a new technology that delivers up to 5.25 MM ft-lb bending capacity for enhanced performance for drilling and completion in water depths up to 10,000 ft (3,048 m).

Other key features include active pre-load lockdown at 2 MM lb; 5.25 MM ft-lb bending capacity; standard and high-capacity 16-in. supplemental hangers and adapters; machined from F-22, 85-ksi yield forged material; available for H2S service; and 7 MM lb end-load carrying capacity on single-landing shoulder for deep wells with complex casing programs.

Cameron says that its deepwater STM wellheads meet the requirements for most subsea drilling operations with deepwater semisubmersibles and drillships, as well as production applications such as tension-leg platforms, deep-draft caisson vessels and all types of subsea trees.

3/7/2012

The STM-15 Type DW5 Deepwater High-Capacity Subsea Wellhead System.

Cameron STM-15 Type DW5 Deepwater High-Capacity Subsea Wellhead System

Related Articles

Technip closes sale of diving assets in Gulf of Mexico

Dec 16, 2014

Technip has completed the sale of its diving assets in the US Gulf of Mexico to Ranger Offshore Inc.

GE to acquire Oceaneering’s Subsea Electric Actuator product line

Dec 16, 2014

GE has signed an agreement to acquire Oceaneering’s Subsea All Electric and Ifokus brands of specialty subsea products.

Statoil sanctions Rutil-Gullfaks tieback offshore Norway

Dec 16, 2014

Statoil and partners Petoro and OMV have committed to develop the Rutil gas/condensate discovery in the Gullfaks Rimfaks valley in the North Sea.

Chevron commissions Captain Phase 4 subsea engineering

Dec 16, 2014

Chevron has contracted Wood Group Kenny Caledonia Ltd. for subsea engineering on its fourth-phase Captain oil field development in the UK central North Sea.

DNV GL sets subsea IMS recommended practice

Dec 15, 2014

DNV GL has published a recommended practice on how to establish, implement, and maintain an integrity management system.

Trending News

BP has agreement in principle to settle governmental Macondo claims

Jul 2, 2015

BP has an agreement in principle to settle all federal and state claims arising from the Macondo oil spill in the Gulf of Mexico. 

Norwegian government realigns Johan Sverdrup field interests

Jul 2, 2015

The Norwegian Ministry of Petroleum and Energy has determined the various ownership interests in the Johan Sverdrup field in the central Norwegian North Sea.

South Pars Phase 1 platform capacity upgrade completed

Jul 2, 2015

Production capacity of Platform SPD1 serving Phase 1 of the South Pars gas field in the Persian Gulf has reached 1 bcm/d (35 bcf/d).

Noreco settles offshore Denmark liabilities

Jul 2, 2015

Norwegian Energy Co. (Noreco) has reached agreement with its joint venture partners in the Danish North Sea on its forfeited licenses and related abandonment liabilities.

COSCO Qidong extends delivery of semisubmersible accommodation rig to Axis Offshore

Jul 2, 2015

COSCO Qidong Offshore Co. Ltd. has agreed to extend the delivery of a harsh environment semisubmersible accommodation rig to Axis Offshore. 

  Offshore
Digital Magazine
Look Inside
Cover
Current Issue

Oil & Gas Jobs

Search More Job Listings >>