Offshore Magazine

Usan floater in place off Nigeria

Social Tools

Offshore staff

CALGARY, Canada – Development of the deepwater Usan field offshore Nigeria remains on track for first oil during the first half of 2012, according to partner Nexen Petroleum.

The FPSO has arrived at the field location and has been successfully moored. Also under way is the process of commissioning the FPSO and connecting the subsea wells to the facility and this should continue into the early part of next year.

At peak, the Total-operated project should deliver 180,000 boe/d.

10/27/2011

Most Recent Content

Rosneft appoints president

Rosneft (MICEX:ROSN) has appointed Igor Sechin as president.

Island Offshore extends FMC contracts for North Sea LWI

FMC Technologies Inc. (NYSE:FTI) has signed two five-year contracts with Island Offshore Management AS to supply light well intervention (LWI) services for Statoil in the North Sea.

Record bids for latest UK license round

Britain has received a record number of applications in its latest offshore licensing round.

Cooper assigns Tunisia well operations to AGR

Cooper Energy has contracted AGR for drilling services offshore Tunisia.

Statoil takes LWI rigs on long-term charters

Statoil (OSE:STL;NYSE:STO) has awarded contracts totaling $1.56 billion for three new “Category A” light well intervention (LWI) vessels, two to Island Offshore Management and one to Eide Marine Services.

Offshore Magazine