Stay Connected

Total adopts SKUA as stand-alone application

Offshore staff

AMSTERDAM, the Netherlands – Total has adopted Paradigm’s SKUA 3D modeling as a stand-alone application. Total also is integrating SKUA into its proprietary geosciences platform using Paradigm/s development tools.

03/23/2011

Related Articles

Pieter Schelte heads to Europe for construction completion

Nov 19, 2014

The Pieter Schelte, Allseas new platform installation/decommissioning and pipelay vessel, is on its way to Rotterdam for completion and testing.

Jack-Up Barge places accommodation order with Asian Offshore Services

Nov 6, 2014

Jack-Up Barge has placed an order with Asian Offshore Services for additional Zone 2 blast-rated temporary living quarters.

SPE ATCE 2014: Baker Hughes CTX software broadens options for completion designs

Oct 29, 2014

Baker Hughes’ has showcased its new Completion ArchiTEX (CTX) 3D completion design software at the SPE ATCE exhibition.

FPSO Petrojarl Knarr arrives in Norway

Sep 19, 2014

The FPSO Petrojarl Knarr left South Korea and has successfully arrived in Norway.

Damen launches first PSV 3300 vessel for PROMAR

Sep 10, 2014

PROMAR recorded a milestone with the sideways launch into the Danube of the first of two Damen PSV 3300s on order.

Trending News

ExxonMobil awards Alternate Path completion license to Delta Screens

Nov 21, 2014

ExxonMobil Upstream Research Co. has awarded Delta Screens & Filtration LLC a limited international license to ExxonMobil’s Alternate Path technology patent portfolio for gravel packing cased-hole and openhole completion wells.

 

EMGS receives survey contract award in Brazil

Nov 21, 2014

Electromagnetic Geoservices ASA has received a contract worth $1.5 million for a research project in Brazil.

QinetiQ acquires seismic capabilities from SR2020

Nov 21, 2014

QinetiQ has acquired the seismic processing and imaging capability of SR2020 Inc. for a purchase price of up to $1.7 million.

Ocean Installer to place Delta House umbilicals

Nov 21, 2014

Ocean Installer has been awarded a contract for an umbilical installation project with Oceaneering for LLOG Exploration on the Delta House project.

Petrobras starts-up FPSO Cidade de Ilhabela

Nov 21, 2014

Petrobras has started production through the FPSO Cidade de Ilhabela from the Sapinhoá field in the Santos basin presalt offshore Brazil.

  Offshore
Digital Magazine
Look Inside
Cover
Current Issue

Oil & Gas Jobs

Search More Job Listings >>