Foster Wheeler lands Perla design work

Offshore staff

ZUG, Switzerland – Cardon IV SA has contracted pre-front-end engineering design and also front-end engineering design for new production facilities in Perla field, Gulf of Venezuela, from Foster Wheeler AG’s Global Engineering and Construction Group.

The new production facilities comprise offshore structures, trees, controls, offshore processing, subsea flowlines, export pipelines, the shore approach and utilities facilities from the wellheads to an onshore gas plant, and tie-in to an existing gas and condensate pipeline system.

Cardon IV S.A is a joint venture of Eni Venezuela B.V and Repsol YPF Venezuela Gas, S.A.


Related Articles

Papa-Terra marks first use of dry tree floating technology offshore Brazil

Dec 12, 2014 Petrobras started production from the Papa-Terra field on Nov. 11, 2013. Papa-Terra is a heavy-oil field in block BC-20 of the Campos basin offshore Brazil in 1,190 m (3,903 ft) of water. Developme...

Top 5 Projects of 2014

Dec 11, 2014

The editors of Offshore magazine have selected five projects that exemplify best-in-class among those that were completed during the first three quarters of this year.

Petrobras transports P-66 hull to Brazilian shipyard

Dec 11, 2014 Petrobras is transporting the hull of P-66, the first platform in a series of eight “replicant” FPSOs being constructed to meet oil production demands in Brazil. This is the first FPSO hull complet...

BG delivers first gas from Starfish offshore Trinidad and Tobago

Dec 9, 2014

BG Group has produced first gas from the Starfish field in the East Coast Marine Area of Trinidad. 

Petrobras reports gas discovery offshore deepwater Colombia

Dec 3, 2014 Petrobras has reported the discovery natural gas at the Orca–1 exploratory well in the Tayrona block, located in Colombian Caribbean deepwater, 40 km (25 mi) off the coast of La Guajira, Colombia.

Trending News

Online exclusive: Woodside to drill up to three wells in the Beagle subbasin

Oct 2, 2015

Woodside Petroleum has announced plans to drill up to three wells in the emerging Beagle subbasin as part of its bid to rejuvenate its North West Shelf portfolio.

Nalcor driven study finds huge potential offshore Newfoundland and Labrador

Oct 2, 2015

The government of Newfoundland and Labrador, Nalcor Energy, and Beicip-Franlab have announced that the “in place” oil and gas resource potential is 12 Bbbl of oil and 113 tcf of gas for 2015 license round area offshore Newfoundland and Labrador.

EMGS, BOA agree on new terms for charter agreements

Oct 2, 2015

Electromagnetic Geoservices ASA has signed an extended charter agreement for BOA’s seabed logging vessel BOA Thalassa at new commercial terms.


Technip secures another subsea contract for the Stones development in the GoM

Oct 2, 2015

Technip has received a contract from Shell Offshore for the development of subsea infrastructure for the Stones project.

UK oil and gas firms are missing opportunities on collaboration, says Deloitte

Oct 2, 2015

Deloitte’s recent survey of oil and gas operators and oilfield services companies has found that a lack of effective supply chain collaboration means companies are missing out on maximizing the potential value from the UK continental shelf.

Digital Magazine
Look Inside
Current Issue

Oil & Gas Jobs

Search More Job Listings >>